Cliffe Vale to St. Blazey ‘Clayliner’

This week my thoughts have turned to train formations, and in particular, the 6V70 Cliffe Vale to St. Blazey china clay working. Research has found that after the closure of the Bescot Curve in March 1993, the service was forced to go north via Walsall from Bescot, before heading south via the sutton park line and Washwood Heath. This is perfect for the time period I’m modelling, and I can now make use of a handful of the new Bachmann Polybulks.
The variation of wagons in the rake would often vary, but usually consisted of Polybulks and Clay Tigers. In addition, a VGA van or Cargowaggon would be added where bagged clay needed to be transported.
Power was normally provided by a pair of 37’s, although as many as four have been photographed, or a class 47. I’m planning on using a pair of ViTrains 37/4’s for this project, as I’m new to P4, and they are an easier conversion to start with than the Bachmann variety. Both will be in Railfreight Distribution triple grey livery, and suitably weathered.

Planning Walsall in P4

Late last year, I decided to take the plunge into P4, and after much researching decided to build a scale model of Walsall Station down to Corporation Street and Tasker Street sidings. Walsall offers an interesting verity of locos and stock for operational and viewing interest, with a large amount of Bescot’s freight traffic passing through. The plan, originally 16ft long, now spans nearly 40ft with the addition of Tasker Street sidings. It’s certainly a long-term project!

The original plan was only 16ft long.
The original plan was only 16ft long.

The period I’ve always modeled is early 1990’s, but during this period Tasker Street (Walsall Freight Terminal as it was later known) was in an unused state. It wasn’t until EWS re-opened the sidings in the late 90’s, as an overflow for Wolverhampton Steel Terminal, that traffic again entered the terminal. After more thought and research, I decided to stick with the period of 1992/1993, as I would lose some interesting freight on the through line when gaining the later freight terminal.

Now extended to nearly 40ft long
Now extended to nearly 40ft long

The planning and basic research has already taken four months, and I’m sure it will be a while before construction of the first baseboards will commence. None the less, an exciting project!